Sustainability | Vol.6, Issue.10 | 2017-05-29 | Pages
A Site Selection Model for a Straw-Based Power Generation Plant with CO2 Emissions
The decision on the location of a straw-based power generation plant has a great influence on the plant’s operation and performance. This study explores traditional theories for site selection. Using integer programming, the study optimizes the economic and carbon emission outcomes of straw-based power generation as two objectives, with the supply and demand of straw as constraints. It provides a multi-objective mixed-integer programming model to solve the site selection problem for a straw-based power generation plant. It then provides a case study to demonstrate the application of the model in the decision on the site selection for a straw-based power generation plant with a Chinese region. Finally, the paper discusses the result of the model in the context of the wider aspect of straw-based power generation.
Original Text (This is the original text for your reference.)
A Site Selection Model for a Straw-Based Power Generation Plant with CO2 Emissions
The decision on the location of a straw-based power generation plant has a great influence on the plant’s operation and performance. This study explores traditional theories for site selection. Using integer programming, the study optimizes the economic and carbon emission outcomes of straw-based power generation as two objectives, with the supply and demand of straw as constraints. It provides a multi-objective mixed-integer programming model to solve the site selection problem for a straw-based power generation plant. It then provides a case study to demonstrate the application of the model in the decision on the site selection for a straw-based power generation plant with a Chinese region. Finally, the paper discusses the result of the model in the context of the wider aspect of straw-based power generation.
+More
plants operation site selection problem integer strawbased power generation plant economic and carbon emission outcomes multiobjective mixedinteger programming model
APA
MLA
Chicago
Hao Lv,Hao Ding,Peng Zhou,.A Site Selection Model for a Straw-Based Power Generation Plant with CO2 Emissions. 6 (10),.
Select your report category*
Reason*
New sign-in location:
Last sign-in location:
Last sign-in date: